Designed and constructed by: |
PANNON GABION Kft. |
Constructed in: |
July-September 2008 |
Construction period: |
45 days |
GABION material: |
Woven mesh 0.30 m thick GABION mattress |
Mesh: |
80 x 100 mm, wire thickness: 2.70 mm |
Anti-corrosion coating: |
Galvanisation |
|
|
Filling stone material: |
60-180 mm grain size grey andesite |
Length of covering: |
306.00 m |
Slope inclination: |
1:2 |
Length of slope: |
6.00 m |
Supporting structure GABION: |
4 x 1 x 1 m |
Volume of slope covering: |
850 m³ |
|